Great Sample Resume

Concrete Supervisor Resume

When writing a Concrete Supervisor Resume remember to include your relevant work history and skills according to the job you are applying for. Whether you're seeking an entry-level position or have been in your career for a few years, exposing your relevant achievements in your resume can allow you to stand out and get that job interview.

This resume example is a great representation of what a hiring manager is looking for in a Concrete Supervisor Resume. Feel free to use this example for reference as you create your own resume or use this easy resume builder that will guide you through every step of your building your resume in just a few minutes.

Here is the Concrete Supervisor Resume example:

Kenneth Caldwell

3620 Hall Street

Las Vegas, NV 89121

(555)-555-5555

[email]

Job Objective Searching for an opportunity to use my years of experience and training as Concrete Supervisor to help growing company meet their goals.

Highlights of Qualifications:

  • Huge experience in civil and building construction work
  • In-depth understanding of construction technologies and solutions
  • Familiarity with trade and labor contracts
  • Skilled in setting steel and wooden forms for concrete
  • Proficient in using pallet jack, forklift, order picker, and reach truck
  • Ability to effectively present information to management and other team members
  • Ability to interpret technical instructions and manuals
  • Great ability to present information and deal with clients
  • Strong management, negotiation, cost control skills
  • Excellent planning and communication skills
  • Strong time management skills

Professional Experience:

Concrete Supervisor, August 2005 to till date

Bechtel, Las Vegas, NV

  • Ensured proper statement of information, materials, tools and construction equipment being communicated to craftsmen.
  • Scheduled and directed sequence of work for craftsmen.
  • Reviewed and updated schedule with the immediate supervisor.
  • Coordinated with cost engineer and understood details of operation of each cost item.
  • Ensured that adequate stock of tools and material was ordered on time.
  • Reviewed and maintained safe working conditions.

Concrete Supervisor, June 2002 to July 2005

Tetra Tech, Las Vegas, NV

  • Ensured optimum utilization of resources to perform planned activities.
  • Coordinated and supervised sub-contractors in particular for pile foundations and steel structures.
  • Implemented adequate construction methods required for execution of works.
  • Ensured time schedule for project is in accordance with the planned timeline.
  • Implemented quality control plan and procedures.
  • Verified bill of quantities as per actual work accomplished.

Education

Bachelor’s Degree in Civil Engineering, Susquehanna University, Selinsgrove, PA

  • 1.0.0Version
  • --Download
  • 1File Count
  • March 1, 2024Create Date
  • March 1, 2024Last Updated

Average Rating

Be the first one to review